Arrivals, Loading, and Departure Checklists Overview for LoadIQ
There is a three stage checklist system to track job progress from arrival through departure. Operators at each Distribution Centre complete checklists at each stage, which automatically updates the job status and ensures compliance with safety and operational requirements.
Arrival Checklist
This checklist covers the time period when the truck arrives at the loading dock and before loading begins.
Purpose:
-
Verify driver safety compliance
-
Record actual arrival time
-
Confirm induction and PPE requirements
What happens after completion:
-
Job status automatically updates to "Arrived"
-
Arrival timestamp is recorded
-
Arrival checklist icon shows as complete
Loading Checklist
This checklist covers the time period during the loading process.
Purpose:
-
Track loading start and end times
-
Record loader and checker names for accountability
-
Document who handled the job
What happens after completion:
-
Loading times are recorded
-
Personnel assignments are logged
-
Loading checklist icon shows as complete
Departure Checklist
This checklist covers the time period between loading completion and truck departure.
Purpose:
-
Complete final safety and compliance checks
-
Capture digital signatures from driver and warehouse staff
-
Upload photos of the loaded truck
-
Record actual departure time
What happens after completion:
-
Departure timestamp is recorded
-
Operator completing the Departure Checklist will have to select one of three statuses:
-
Completed
-
Completed - Partial
-
Completed - Needs Follow-Up
-
-
All checklist data is saved and accessible in the booking record
Checklist Completion Icons
Each checklist section displays an icon showing its status:
-
No icon - Not started
-
Yellow clock icon - Partially complete (some fields filled)
-
Green checkmark icon - Fully complete (all required fields filled)
These icons provide a quick visual overview of job progress.
Status Updates
Automatic status changes based on checklist completion:
-
Scheduled → Arrived (when arrival time is recorded)
-
Arrived → Completed (when both arrival and departure checklists are fully complete)
Manual status changes:
-
Administrators and Schedulers can manually change job status at any time
-
Operators cannot change status manually (status updates automatically based on checklist completion)
Completion Requirements
For Operators :
-
Cannot mark a job as "Completed" unless both Arrival and Departure checklists are fully complete
-
System enforces this requirement
For Administrators & Schedulers :
-
Can override completion requirements
-
System warns if checklists are incomplete but allows manual status change to "Completed"